Skip to main content
FairWorkMate

Lockout Tagout Procedure Builder

Build a lockout/tagout isolation procedure for your plant — every energy source, whether a multi-worker lock station is needed, and the verification step before work starts.

Last verified: 26 July 2026

Which energy sources does this plant have?

Mains, generator, battery or capacitor supply.

Pressurised hydraulic fluid systems.

Pressurised compressed-air systems.

Compressed or tensioned springs, counterweights, flywheels.

Parts that could fall or drift once support is removed.

Heat that hasn't yet dissipated.

Residual product left in lines or vessels after shutdown.

More than one worker means a multi-worker lock station is required.

Victoria and Western Australia run their own plant-isolation instruments alongside the model WHS scheme.

Get notified when rates change

Free alerts when minimum wage, award rates, or workplace laws are updated.

Free forever. No spam. Unsubscribe anytime.

General information and estimates only — not legal, financial or tax advice. Always check your specific award, agreement or contract, or a qualified professional, before you rely on the result.